League City, Texas, Has Allocated 184 Million Dollars for Water System Upgrades

Updated On:
League City, Texas, Has Allocated 184 Million Dollars for Water System Upgrades

The city is actively working to improve its water and wastewater infrastructure to ensure reliable services for residents. With ten booster pump stations, four elevated storage tanks, nine groundwater wells, two wastewater treatment plants, and 76 lift stations, the city’s network is extensive. The Project Management group is currently overseeing multiple maintenance and construction projects, covering various stages of study, design, and construction.

Key Projects Underway

1. Sewer System Rehabilitation

Upgrading the sewer system is a top priority to address aging infrastructure and improve efficiency. Two major force main replacements are in progress:

  • East Main 24-inch Force Main Replacement:
    This project focuses on replacing old sewer lines along FM 2094, Robinson Bayou, and Coryell Street. Emergency repairs have already been completed, and the final phase of construction is scheduled to begin in April 2025.
  • Jarbo Bayou Force Main Replacement:
    The replacement work here is complete, with successful testing and demolition of the old sewer line. Final restoration activities are ongoing and will continue based on weather conditions.

2. Waterline Replacements

To improve water distribution, the city is replacing aging waterlines in key neighborhoods:

  • Areas Covered:
    • Pecan Forest
    • Highland Terrace
    • Clear Creek Heights
    A total of 23,000 linear feet of waterlines are being replaced. Construction in Clear Creek Heights and Highland Terrace is already complete. The ongoing installation of an 8-inch waterline along Boden St., Berns St., and Abilene St. is expected to finish by March 2025.

3. Water System Connections

Efforts to enhance water service include connecting new areas to the city’s water supply:

  • Mary Lane and Tallow Forest Areas:
    Previously served by WCID #1, these areas are now fully connected to the city’s water system. The force main installation is complete, and new lift station equipment, sourced from Sweden, is expected to arrive in February 2025.

4. East Main Lift Station Upgrade

The city is upgrading the East Main Lift Station to improve its performance, especially during storms:

  • Project Details:
    • Conversion to a submersible system for better reliability
    • Installation of new pumps, piping, and additional safety features
    • Construction will start once the necessary equipment is delivered

The city’s ongoing water and sewer projects reflect a strong commitment to maintaining and upgrading essential infrastructure. From replacing aging pipelines to improving lift stations and expanding water service areas, these projects aim to provide residents with reliable, safe, and efficient water and wastewater systems. With key projects like the East Main Force Main Replacement, waterline upgrades, and the East Main Lift Station conversion, the city is investing in long-term sustainability and service excellence.

SOURCE