FORMS No. PROPERTY OPWNER ACTIONS DEVELOPMENT PERMITS                  
 
     
1 Fee Schedule                   FS1   - Note information                                                        
2 Application for a Development Permit     CZO 3A - Complete (when applicable, requires LCRA Septic System Permit) }                          
3 Floodplain Development Notice/Application FP1   - Complete (please note information on reverse side)           } Return these to                          
4 Floodplain Application Fact Sheet       FP2   - Complete                                   } City Hall with                          
5 Rules for Construction Site           R1   - Note information & sign                           } Fee payment                          
6 911 form (when applicable)                 - Complete                                   }                          
                         
Next Steps:                          
A. City Clerk completes the Development Permit form, enters the application in the LOG and then passes all forms in one folder to the Building Inspector.                          
1. A copy of the application is kept in the City Hall 10-day tickler file.                          
B. Building Inspector reviews applications, checks against ordinances and may inspect the physical property.                          
1. May consult with applicant and/or City Officials to reach a conclusion to Grant/Deny a Permit.                          
2. If the Permit is granted the folder is returned to the City Clerk who will asign the Permit Number, notify the Applicant and distributes copies as per                          
C. below.                          
3. In the event of Denial, the Applicant is informed by personal contact.                          
C. Approved Applications are then processed by the City Clerk as follows:                          
Number of copies and distribution:                          
1. Development Permit 3 -                          
Applicant 1 plus original (for posting at construction site                          
Property File 1                          
Building Inspector 1 for 6-month followup                          
LCAD 1 with plans, drawings, sketches (and 911 when a new residence is involved)                          
2. Application for a Development Permit 2 -                          
Property File Original application CZO 3A with plans, drawings, sketches                          
Building Inspector 1 for 6-month followup                          
3. Floodplain Development Notice/Application 1                          
Property File Original                          
Building Inspector 1 for 6-month followup                          
4. Floodplain Application Fact Sheet 1 -                          
Applicant Original                          
Property File 1                          
5. Rules for Construction Site 1 -                          
Applicant Original                          
Property File 1 (signed by Applicant)                          
D. Permits expire 6 months from date of issue.                          
1.  A maximum of 2 Extensions is allowed, each with a 6-month validity.                          
2. Extensions expire 12 months and 18 months from the original date of issue, respectively, regardless of the date applied for.                          
E. Additional Permits may be required depending on specific circumstances, for example:                          
Certificate of occupancy                          
LCRA Septic System                          
Right of Way & Road Cuts & Bores.                          
Construction without a residence cannot be authorized but requires a Variance Hearing